This is our 84th post in the Infinity Hash Weekly Update series for Mar 10 2025.
This week we added no new miners. Mining profits for Infinity Hash went up a bit, with the price for IHS going down together with Bitcoin. We further improved the registration flow, started summer preparations at the farm, and resolved a major infrastructure maintenance task by replacing an old transformer with a new one while minimizing downtime.
Siempre puedes consultar todos los gráficos y cifras anteriores en la página de Actualizaciones Semanales..
Actualizaciones del Proyecto
Infinity Hash en Cifras
Estos son los datos de la week 10, 2025, del 2025-03-03 al 2025-03-09.
Métrica | Datos Actuales | Cambio |
---|---|---|
Total de Mineros | 965 Miners | + 0 Miners |
Hashrate Total | 125.45 PH/s | + 0.69 PH/s |
Total de IHS | 1,119,071 IHS | + 11,566 IHS |
Precio del IHS | $ 2.26 | – 18.15 % |
Recompensas Generadas | 0.48377206 BTC | + 2.59 % |
Reinvertido | 7,334 USDT | + 320 USDT |
Electricidad Pagada | 28,338 USDT | + 781 USDT |
Actualizaciones del Panel e Implementaciones
This week, we added country selection to our registration flow, which enables us to:
- Only display supported payment methods to users (preventing frustration due to failed card and fiat payments).
- Reduce compliance risks for the project to uphold our long-term commitment to user privacy and ease of use.

Upon registration or your next login, you’ll see the country list pop-up in the dashboard. Should you have any questions or problems, feel free to contact us!
Actualizaciones de Mineros y de la Instalación de Minería
Addendum: We forgot to mention 4 new Whatsminer M60S (total hash rate of 760 TH/s) from IHS sales that have been added on February 17th. The affected weekly update #82 was updated with the according table under Actualizaciones de Mineros y de la Instalación de Minería.
Transformer repair and replacement
We detected problems with one of our older transformers (oil leakage and connectors overheating).
The transformer was now transported off-site for repairs and will be back in a few weeks. We also have an additional new transformer arriving on-site, so there will be no downtime because of this.
After first diagnosis, everything was prepared for the transport of the old transformer to the repair center, mainly making sure the crane and truck had proper access.
We timed the truck and crane to directly deliver the new transformer within the same transport to save costs and prevent any downtime for new miners arriving on site in the following weeks.
Enlaces y Perspectivas
Artículos y Redes de Infinity Hash
This week you’ll find your Mining industry recap (Episode 25).
Mining Industry Recap, Episode 25
Condiciones Meteorológicas
Las condiciones meteorológicas actuales en la instalación de minería son: Clear. Cold. Las temperaturas actuales de -11.72°C / 10.91°F provide excellent cooling conditions, with the weather forecast showing no changes in temperatures. This should result in stable profits.
Transparencia
Siempre puedes consultar nuestros enlaces al pool y a la wallet para obtener una visión completa y transparente de nuestro pool, todos los mineros incluidos, nuestra wallet pública de reinversión y los costes de electricidad en la siguiente página:
Enlaces de pool de minería y carteras
Como siempre, ha sido un placer brindarte la información más reciente sobre el proyecto Infinity Hash. ¡Deseamos a toda nuestra comunidad una excelente semana y una feliz experiencia minera!